Results update as you type.
Check the working before you order.
| Excavation (324.58 m³) | 4,869 |
| Concrete (38.25 m³) | 9,563 |
| Waterproofing (188.0 m²) | 3,760 |
| Interior finishing (71.3 m²) | 21,375 |
| Other items | 5,000 |
| Usable floor area inside the walls | 71.3 m² |
| Cost per m² of usable floor | 625 |
| Concrete: walls + slab | 26.25 + 12.00 m³ |
| Excavation (bank volume) | 324.6 m³ |
Budget estimate from your rates. Ground water, rock, shoring and design fees can add a lot: get a site survey and quotes.
Your prices are remembered on this device only.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
Generated with myconstructioncalculator.com. Estimates for planning and ordering only; verify against drawings and specifications.
Basement Construction Cost Calculator byMy Construction Calculator: free construction calculators with the working shown.