Results update as you type.
Check the working before you order.
| Cut needed to make the fill (bank) | 889 m³ |
| Balance | 89 % of earthworks balanced on site |
| Export truck loads | 14 (139 m³ loose) |
| Import truck loads | 0 (0 m³ loose) |
Your prices are remembered on this device only.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
Generated with myconstructioncalculator.com. Estimates for planning and ordering only; verify against drawings and specifications.
Cut & Fill Balance Calculator byMy Construction Calculator: free construction calculators with the working shown.