Results update as you type.
Check the working before you order.
| Cost to build the house (without land) | 128,800 |
| Construction | 100,000 |
| Site work (7.6%) | 7,600 |
| Foundations (10.5%) | 10,500 |
| Framing (16.6%) | 16,600 |
| Exterior finishes (13.4%) | 13,400 |
| Major systems (plumbing, electrical, HVAC) (19.2%) | 19,200 |
| Interior finishes (24.1%) | 24,100 |
| Final steps (landscaping, driveway, clean-up) (6.5%) | 6,500 |
| Other (2.1%) | 2,100 |
| Design fees (8%) | 8,000 |
| Contingency (10%) | 10,800 |
| Connections and permits | 10,000 |
| Land | 60,000 |
| All-in cost per m² (without land) | 644 |
A budget estimate, not a quote. Stage shares are US averages; your split will differ with design, site and country.
Your prices are remembered on this device only.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
Generated with myconstructioncalculator.com. Estimates for planning and ordering only; verify against drawings and specifications.
Home Construction Cost Calculator byMy Construction Calculator: free construction calculators with the working shown.