Plaster sand = area × thickness × 1.27 × n ÷ (1 + n) for a 1:n mix. 500 m² of 12 mm plaster in 1:5 needs 6.35 m³ (224 cft) of dry sand (about 10 t). Damp sand bulks around 20%, so order about 7.6 m³ by loose volume: 2 loads of 6 m³.
My Construction Calculator
Sand Quantity Calculator
Inputs
Results update as you type.
Diagram updates as you type.
Results
Check the working before you order.
Sand needed (dry)
6.35m³
In cubic feet (cft)
224 cft
Loose volume to buy (damp)
7.62 m³
Weight
10.16 t
Truck loads
2 loads
Sand for plaster
6.35 m³
Price This optional: add your own prices
Your prices are remembered on this device only.
Send Order WhatsApp, SMS or email to your supplier
Loose damp volume = × (1 + 20% bulking) = 7.620 m³; weight = dry × density = 10.16 t
Scan to open this calculationThe code links to this calculator with your inputs, so anyone can scan it with a phone camera and see the same result. Save it for a report, a site board or WhatsApp.Test copy: this code opens the live site, myconstructioncalculator.com, so it works on a phone once the site is launched.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
About 1.2–1.3 m³ (43–46 cft) for 12 mm plaster: 1.22 m³ for 1:4 and 1.31 m³ for 1:6.
What is bulking of sand?
Damp sand takes up more space than dry sand because water films push the grains apart (often 15–30% more). Sand bought by volume when damp therefore contains less sand than its volume suggests.
How many cft are in 1 m³ of sand?
35.31 cubic feet.
Embed This Calculator on Your Website
Free for any website: contractors, suppliers, blogs and schools. Paste this code where you want the calculator to appear. It works in WordPress (Custom HTML block), Wix, Squarespace and plain HTML.