Development length is the embedment a bar needs to reach its yield stress. IS 456: Ld = φ·0.87fy ÷ 4τbd: 47φ for Fe415 in M20 and 48.5φ for Fe500 in M25. ACI 318-19: ld = fy·ψ ÷ (25λ√f'c)·db for No. 6 and smaller with good detailing: 37.9db for Grade 60 in 4,000 psi concrete.

Inputs

Results update as you type.

Code & bar
Materials & conditions
Development lengthDevelopment length 777 mm777 mmsupport / concretemyconstructioncalculator.comNot to scale
Diagram updates as you type.

Results

Check the working before you order.

Development length in tension
777mm
In bar diameters48.5 × db
Development length in compression621 mm
Compression in bar diameters38.8 × db

Uses the simplified code equations. Your structural drawings and the engineer of record govern: they may specify longer laps, different splice classes, or seismic detailing.

Price This optional: add your own prices

Your prices are remembered on this device only.

Send Order WhatsApp, SMS or email to your supplier
Include
Working
  1. τbd (M25) = 1.40 N/mm² × 1.6 (deformed bars) = 2.24 N/mm²
  2. Ld = φ × 0.87 fy ÷ (4 τbd) = 16.0 × 0.87 × 500 ÷ (4 × 2.24) = 777 mm (48.5 φ)
  3. Compression: τbd × 1.25 → Ld = 621 mm (38.8 φ)

Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.

Formulas

IS 456:2000

Ld = φ × σs ÷ (4 τbd),   σs = 0.87 fy
τbd (plain, tension): M20 1.2, M25 1.4, M30 1.5, M35 1.7, M40+ 1.9 N/mm²
× 1.6 for deformed bars; × 1.25 in compression

ACI 318-19

ld  = fy ψt ψe ψg ÷ (C λ √f'c) × db,  ≥ 12 in
      C = 25 (No. 6 and smaller) or 20 (No. 7 and larger) with clear spacing ≥ db, cover ≥ db, stirrups
      C = 50/3 or 40/3 for other cases;  ψt ψe ≤ 1.7;  √f'c ≤ 100 psi
ldc = max(fy ÷ (50 λ √f'c), 0.0003 fy) × db,  ≥ 8 in

Worked Example

16 mm Fe500 deformed bar in M25 (IS 456):

  1. τbd = 1.4 × 1.6 = 2.24 N/mm²
  2. Ld = 16 × 0.87 × 500 ÷ 8.96 = 777 mm = 48.5φ
  3. In compression: τbd = 2.80 → 621 mm = 38.8φ

IS 456 Development Length in Tension (deformed bars)

Steel M20 M25 M30 M35
Fe415 47.0φ 40.3φ 37.6φ 33.2φ
Fe500 56.6φ 48.5φ 45.3φ 40.0φ

ACI 318-19 Tension Development, Grade 60, Good Detailing (in)

Bar 4,000 psi 5,000 psi
#3 14.2 12.7
#4 19.0 17.0
#5 23.7 21.2
#6 28.5 25.5
#7 41.5 37.1
#8 47.4 42.4

Worked Examples

Frequently Asked Questions

What is development length?

The length of bar that must be embedded in concrete beyond the point where it is needed, so bond can transfer its full force. It is used at supports, cut-off points and anchorages.

Why are top bars longer under ACI?

Bars with more than 12 in (300 mm) of fresh concrete cast below them bond less well, because water and air collect under them. ACI multiplies their development length by ψt = 1.3.

Is development length the same as lap length?

No. Lap length is based on development length but is often longer (1.3 ld for an ACI Class B splice) and has its own minimums such as 30φ in IS 456.

References

  • ACI 318-19 Table 25.4.2.3 and §25.4.9 (compression)
  • IS 456:2000 cl. 26.2.1 and cl. 26.2.1.1 (design bond stress)
Embed This Calculator on Your Website

Free for any website: contractors, suppliers, blogs and schools. Paste this code where you want the calculator to appear. It works in WordPress (Custom HTML block), Wix, Squarespace and plain HTML.

Preview
All Rebar & Steel Calculators