REBAR & STEEL · FIELD TOOL

Rebar Grid Calculator

Intersections = bars one way × bars the other way. A 6 × 4 m grid of 12 mm bars at 200 mm with 50 mm cover has 20 × 30 = 600 crossings; tying every other one needs 300 ties and about 1.4 kg of 1.6 mm wire. The grid weighs 209 kg (8.7 kg/m²).

Free Account Required

Sign up free with your email or Google to use this calculator. It takes under a minute and unlocks every calculator on the site.

Behind this panel: an example with the default sizes.

Inputs

Results update as you type.

Grid
m
m
mm
mm
mm
Tying
mm
Rebar grid with ties6 m4 m300 ties · 600 crossingsmyconstructioncalculator.com
Diagram updates as you type.

Results

Check the working before you order.

Intersections
600crossings
Ties300 ties
Tie wire1.4 kg
Bars20 × 30 each way
Steel in the grid208.6 kg
Weight per m²8.69 kg/m²
Price This optional: add your own prices

Your prices are remembered on this device only.

Send Order WhatsApp, SMS or email to your supplier
Include
Working
  1. Bars along the length = 20; along the width = 30
  2. Intersections = 20 × 30 = 600
  3. Ties = 600 × 0.5 = 300; wire = 300 × 300 mm of 1.6 mm wire = 1.4 kg

Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.

Formulas

Bars each way     = ⌊(span − 2 × cover) ÷ spacing⌋ + 1
Intersections     = bars along length × bars along width
Ties              = intersections × fraction tied
Tie wire          = ties × length per tie × π/4 × 1.6² mm² × 7,850 kg/m³

Worked example

A 6 × 4 m grid, 12 mm bars at 200 mm both ways, 50 mm cover, alternate crossings tied with 300 mm of wire:

  1. Bars = 20 along the length × 30 along the width
  2. Intersections = 600 → ties = 300
  3. Tie wire = 300 × 4.7 g = 1.4 kg
  4. Grid steel = 208.6 kg = 8.69 kg/m²

Crossings per m² by spacing (both ways)

Spacing Crossings per m² Ties (alternate)
150 mm 44.4 22
200 mm 25.0 13
250 mm 16.0 8
300 mm 11.1 6

Frequently Asked Questions

How many ties does a rebar grid need?

Count the intersections (bars one way × bars the other way). Many specifications allow tying alternate intersections in the field and every intersection around the edges; heavy mats or walkable mesh may need every crossing tied.

How much tie wire do I need?

About 250–350 mm of 1.6 mm (16 gauge) annealed wire per tie (roughly 5 g). 1,000 ties use about 5 kg.

How many ties per square metre?

At 200 mm spacing both ways there are 25 crossings per m², about 12–13 ties if alternate crossings are tied.

All Rebar & Steel Calculators