BUILDING & PLANNING · FIELD TOOL

Construction Cost Calculator

Construction cost = built-up area × rate per unit area, plus contingency and fees. A 2-storey building of 150 m² per floor (300 m²) at 500 per m² is 150,000 for construction; with 10% contingency and 6% fees the budget is 174,000, or 580 per m² all-in.

Inputs

Results update as you type.

Building
m²
Rates
/m²
Total 174,000Total 174,000Construction (base)150,000Contingency (10%)15,000Fees (6%)9,000myconstructioncalculator.com
Diagram updates as you type.

Results

Check the working before you order.

Estimated total cost
174,000
Construction (base)150,000
Contingency (10%)15,000
Fees (6%)9,000
Total built-up area300 m²
All-in cost per m²580.00

This is an order-of-magnitude budget. Land, furniture, external works and financing are not included.

Price This optional: add your own prices

Your prices are remembered on this device only.

Send Order WhatsApp, SMS or email to your supplier
Include
Working
  1. Area = 150.0 m² × 2 floors = 300.0 m²
  2. Base = 300.0 × 500.00 = 150,000
  3. Contingency = 150,000 × 10.0% = 15,000
  4. Fees = 150,000 × 6.0% = 9,000
  5. Total = 174,000

Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.

Formula

Total area   = Area per floor × Floors
Base cost    = Total area × Rate per m² (or ft²)
Contingency  = Base × contingency %
Fees         = Base × fees %
Total        = Base + Contingency + Fees

Worked Example

A 2-storey house, 150 m² per floor, rate 500 per m², 10% contingency, 6% fees:

  1. Total area = 150 × 2 = 300 m²
  2. Base = 300 × 500 = 150,000
  3. Contingency = 15,000; fees = 9,000
  4. Total = 174,000: that is 580 per m² all-in

Contingency by Design Stage

Stage Typical contingency
Concept / feasibility 15–20%
Developed design 10–15%
Tender drawings priced 5–10%
Under construction 3–5%

Assumptions

  • A single average rate for the whole building. Basements, roofs with plant, and high-spec areas cost more per m².
  • This is a budget, not a quotation. For a reliable figure, get a bill of quantities priced, starting with tools like the concrete and brick calculators.

Frequently Asked Questions

How do I estimate construction cost per square metre?

Use recent rates for similar buildings in your area (from contractors, a quantity surveyor or published cost guides) and multiply by the total built-up area. Rates vary several times over between countries, cities and specifications.

How much contingency should I add?

Around 15–20% at concept stage, 10–15% once the design is developed, and 5–10% when drawings are complete and priced.

What is not included in construction cost?

Land, furniture, landscaping, boundary walls, utility connections, financing and taxes are often outside a per-m² rate. Check what your rate covers.

Which currency does the calculator use?

Any. Enter your rate in your own currency and the results come out in the same currency.

Embed This Calculator on Your Website

Free for any website: contractors, suppliers, blogs and schools. Paste this code where you want the calculator to appear. It works in WordPress (Custom HTML block), Wix, Squarespace and plain HTML.

Preview