Results update as you type.
Check the working before you order.
| Compacted volume | 279 m³ |
| Loose volume to deliver | 349 m³ |
| Geotextile | 1,243 m² |
| Road area incl. bays and turning | 930 m² |
| Passing bays | 1 |
| Tipper loads | 30 |
Thickness depends on ground strength (CBR) and traffic: check with the temporary works designer, and plan drainage ditches alongside.
Your prices are remembered on this device only.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
Generated with myconstructioncalculator.com. Estimates for planning and ordering only; verify against drawings and specifications.
Temporary Access Road Planner byMy Construction Calculator: free construction calculators with the working shown.