CONCRETE JOINT & WATERSTOP TOOLS · FIELD TOOL

Concrete Expansion Joint Spacing Planner

Joint movement = α × panel length × temperature range. A 90 m slab with joints every 30 m and a 40 °C range moves 12 mm per joint (± 6 mm), so a ± 25% sealant needs a joint at least 24 mm wide. Slabs on ground also need contraction joints at 24–36 × thickness: 3.6–5.4 m for 150 mm.

Inputs

Results update as you type.

Structure
m
mm
Expansion joints
m
Δ°C
Joint layout along the slab2 → 3 panels of 30.00 m90 mexpansion jointscontraction jointsmyconstructioncalculator.comNot to scale
Diagram updates as you type.

Results

Check the working before you order.

Expansion joints
2→ 3 panels of 30.00 m
Movement at each joint12.0 mm (± 6.0 mm)
Minimum joint width24.0 mm for a ± 25% sealant
Contraction joint spacing (24–36 t)3.6–5.4 m use ≈ 4.5 m
Contraction joints per panel6 at 4.29 m each way
Saw-cut depth (¼ of slab)37.5 mm

Joint layout is a design decision: follow the joints on the structural drawings. Also add joints at changes in shape, re-entrant corners and where the building changes height.

Price This optional: add your own prices

Your prices are remembered on this device only.

Send Order WhatsApp, SMS or email to your supplier
Include
Working
  1. Panels = ⌈90.00 ÷ 30.00⌉ = 3 → 2 expansion joints, panels 30.00 m
  2. ΔL = α × L × ΔT = 10.0×10⁻⁶ × 30.00 m × 40.0 °C = 12.0 mm
  3. Width = (ΔL ÷ 2) ÷ 25% = 24.0 mm (sealant moves ± about the installation width)
  4. ACI 360R: contraction joints at 24–36 × 150.0 mm = 3.60–5.40 m; many specifications cap this at about 4.5 m (15 ft)

Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.

Formulas

Panels             = ⌈length ÷ joint spacing⌉;  joints = panels − 1
Movement per joint ΔL = α × panel length × ΔT
Minimum width      = (ΔL ÷ 2) ÷ sealant movement capability
Contraction joints = 24–36 × slab thickness (ACI 360R)

Worked Example

90 m long slab on ground, 150 mm thick, expansion joints at 30 m, ΔT = 40 °C, α = 10 × 10⁻⁶/°C, ± 25% sealant:

  1. 2 expansion joints, three 30 m panels
  2. ΔL = 10⁻⁵ × 30 × 40 = 12 mm (± 6 mm)
  3. Minimum joint width = 6 ÷ 0.25 = 24 mm
  4. Contraction joints at 3.6–5.4 m → use about 4.3–4.5 m, sawn 37.5 mm deep (¼ of the slab)

Movement and Joint Width (ΔT 40 °C, α 10 × 10⁻⁶, ± 25% sealant)

Joint spacing Movement Minimum width
20 m 8 mm 16 mm
30 m 12 mm 24 mm
40 m 16 mm 32 mm
50 m 20 mm 40 mm

Contraction Joint Spacing (ACI 360R, 24–36 t)

Slab Spacing range
100 mm (4 in) 2.4–3.6 m (8–12 ft)
125 mm (5 in) 3.0–4.5 m (10–15 ft)
150 mm (6 in) 3.6–5.4 m (12–18 ft)
200 mm (8 in) 4.8–7.2 m, often capped near 4.5 m

Frequently Asked Questions

How far apart should expansion joints be in concrete?

In buildings, commonly every 30–45 m (100–150 ft), closer in hot climates, on exposed roofs and in long parapets. Joint spacing is a design decision shown on the structural drawings.

How far apart should control joints be in a slab?

ACI 360R guidance is 24 to 36 times the slab thickness (3.6–5.4 m for a 150 mm slab) with many specifications capping it at about 4.5 m (15 ft). Keep panels close to square.

How wide should an expansion joint be?

Wide enough that the sealant stays within its movement capability. Joint width = (total movement ÷ 2) ÷ capability: 12 mm of movement with a ± 25% sealant needs 24 mm.

References

  • ACI 360R: Guide to Design of Slabs-on-Ground: contraction joint spacing 24–36 × slab thickness
Embed This Calculator on Your Website

Free for any website: contractors, suppliers, blogs and schools. Paste this code where you want the calculator to appear. It works in WordPress (Custom HTML block), Wix, Squarespace and plain HTML.

Preview
All Concrete Joint & Waterstop Tools