Height of instrument = benchmark level + backsight; each point's level = HI − its staff reading. With BM 100.000 and a 1.250 backsight, HI is 101.250; readings of 1.800, 0.950 and 2.400 give levels of 99.450, 100.300 and 98.850, so B is 0.850 m higher than A.
Free Account Required
Sign up free with your email or Google to use this calculator. It takes under a minute and unlocks every calculator on the site.
Scan to open this calculationThe code links to this calculator with your inputs, so anyone can scan it with a phone camera and see the same result. Save it for a report, a site board or WhatsApp.Test copy: this code opens the live site, myconstructioncalculator.com, so it works on a phone once the site is launched.
Results are estimates for planning and material ordering only. They are not a substitute for structural design or approval by a qualified engineer. Read the full disclaimer.
Scan to open this calculation with the same inputs.
Generated with myconstructioncalculator.com. Estimates for planning and ordering only; verify against drawings and specifications.
Formula
HI = RL(BM) + backsightRL(point) = HI − foresightDifference = RL(B) − RL(A) = FS(A) − FS(B)
Worked example
Point
Backsight
Foresight
HI
Reduced level
BM
1.250
101.250
100.000
A
1.800
99.450
B
0.950
100.300
C
2.400
98.850
B is 1.800 − 0.950 = 0.850 m higher than A.
Good levelling practice
Keep backsight and foresight distances roughly equal to cancel collimation error.
Read the staff vertically and to the nearest millimetre.
Close the run back on a benchmark and check the misclosure against your tolerance.
Frequently Asked Questions
How do you calculate level difference with a dumpy level?
Take staff readings at both points from the same instrument position. The difference in level is the difference between the readings: a smaller reading means a higher point.
What is the height of instrument method?
Add the backsight on a benchmark to the benchmark level to get the height of the instrument's line of sight, then subtract each foresight to get that point's reduced level.
What are backsight and foresight?
The backsight is the first reading taken on a point of known level (benchmark) from a set-up; foresights are readings on points whose levels you want.